Thursday, October 23, 2008

On the road...

On a two week tour with Greycoats to the big apple and back. Will return at the end of the month...

Thursday, October 9, 2008

In the meantime...

I brought some of my equipment home and am working on mixes in my basement until the new studio is finished. It's actually been a decent place to work!

Build-Out Phase Six

The second layer of sheet rock has been applied and the sanding will soon be finished. Yesterday I had my custom studio window installed. It is enormous! A whopping 8' 4" long by 4' 4" tall. Two insulated panes of glass one flat and the other at an angle. On our way to the finishing touches...

Build-Out Phase Five

The first layer of sheet rock has been added to the control room walls, the small iso room, the large iso room and the big storage closet.

Monday, October 6, 2008

Build-Out Phase Four

I've run all the necessary cables through the walls to each isolation room and filled the remaining walls with insulation...

Friday, October 3, 2008

Build-Out Phase Three

FRAMING!

The walls are framed and the studio is beginning to take shape. I've run all the necessary cables through the walls. Next up... sheet rock!