Wednesday, September 17, 2008
Build-Out Phase Two
The first layer of sheet rock has been hung and the second layer is going on. They're using a special green glue made specific for floating walls to adhere it to the first layer.
Monday, September 15, 2008
Build-Out Phase One
We have begun the build-out. We've put in floating walls for optimum sound so our neighbors don't get blasted with sound every time we set up a drum kit. All the framing and sound channel for the walls around the perimeter of the room is up and this very day the first round of sheet rocking is under way. Two layers of 5/8" sheet rock separated by Green Glue for added sound absorption. After the perimeter of the room is done they will begin framing in the isolation booths, entrance room, a large closet and the wall between the control room and tracking room. It will all be finished in two weeks (God help us).
New Studio
Subscribe to:
Posts (Atom)